Major works this autumn

We’re working to build better and safer roads across our state. As part of Victoria’s Big Build, works continue to build an alternative to the West Gate Bridge and remove 75 dangerous and congested level crossings. Critical maintenance on roads and public transport will also take place over summer.

These works will cause delays to key roads and surrounding areas. Be sure to plan ahead, allow extra time or take an alternative route if possible, especially if you’re travelling over the holiday period.

Check the list of major works below to see which roads will be impacted and when, or subscribe to daily alerts.

For information on summer works on public transport at ptv.vic.gov.au

Find out more about Victoria’s Big Build at bigbuild.vic.gov.au.

Visit coronavirus.vic.gov.au for more details on current restrictions and the latest advice.

We would like to hear from you about your recent travel experience that has been impacted by these works. Complete this short survey to provide us with your feedback. 

Location & Dates Description
Line/s Disruption Works start Works finish
Disruption 1 Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed cursus ipsum in posuere cursus. Proin nec scelerisque risus, vitae efficitur felis. Day Date Month Day Date Month
Disruption 2 Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed cursus ipsum in posuere cursus. Proin nec scelerisque risus, vitae efficitur felis. Day Date Month Day Date Month
Disruption 3 Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed cursus ipsum in posuere cursus. Proin nec scelerisque risus, vitae efficitur felis. Day Date Month Day Date Month
Disruption 4 Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed cursus ipsum in posuere cursus. Proin nec scelerisque risus, vitae efficitur felis. Day Date Month Day Date Month

 


Location & Dates Description
JANUARY   
North

Level Crossing Removal Project

Glenroy Road, Glenroy

8/1/2021 - 28/2/2021

Glenroy Road closed at the level crossing.

Detours via Camp Road in the north and Gaffney Street in the south.

More information here 

 
North East
 

North East Link Project

Bulleen Road

January - October 2021

 

Overnight lane closures and changed traffic conditions on Bulleen Road.

West

West Gate Tunnel Project

Princes Fwy to Geelong Road

11/1/2021 - 22/2/2021

The Princes Freeway to Geelong Road inbound and outbound ramps will be closed. 

More information here

 

West Gate Tunnel Project

Grieve Parade

11/1/2021 - 22/3/2021

Grieve Parade will be reduced to one lane in each direction.

More information here

 

West Gate Tunnel Project

M80 and Millers Road

11/1/2021 - 22/2/2021

Overnight freeway closures between the M80 Ring Road and Millers Road.

More information here

FEBRUARY   
South East

Level Crossing Removal Projects

Clyde Road, Berwick

19/2/2021 - 26/2/2021

 

Full closure of Clyde Road in both directions at the level crossing. Traffic will be detoured via Princes Freeway and Princes Highway.

 
 

Other ways to stay informed

For more information on road works and real-time updates, make sure you:

For information on autumn disruptions on public transport visit PTV

Find out how these changes today are building better transport for tomorrow at Victoria’s Big Build 

Visit coronavirus.vic.gov.au for more details on current restrictions and the latest advice.

 

 